A complex automation project was struggling when a system integrator, after acquiring a smaller company specializing in end-of-line packaging, struggled to meet the production rate required by their end user. The project, plagued with delays and setbacks for nearly two years, faced an ultimatum from the end client: deliver results or risk losing business entirely. Enter AMT.
AMT identified the key challenges, implemented strategic solutions, and ultimately transformed the project into a success story that exceeded expectations.
AMT’s client was a system integrator known for excelling in primary line packaging—think high-speed production lines for food processing manufacturers, such as burger production. Their expertise, however, ended before the final stage: palletization. To bridge this gap, the integrator acquired a specialized end-of-line packaging company, inheriting an active project with a major food processing company.
However, the acquisition had an unintended consequence—there was a reorganization of the engineering team, leaving the new team to pick up where they left off. The end-user issued a stark warning: complete the project or face contract termination.
For nearly two years, the integrator attempted to complete the project but struggled to meet expectations. The Factory Acceptance Test (FAT) was delayed multiple times due to persistent issues. The primary challenges included:
With millions of dollars at stake, the integrator contracted AMT to bolster the team. Given only four months to get the project back on track, AMT’s engineering team quickly assessed the situation.
Key Steps Taken by AMT:
With AMT’s involvement, the project saw a remarkable transformation:
Ben Kurth, Engineering Manager, reflected on the experience: “This was an incredible collaborative effort between the client and AMT’s engineering and service teams. The project was extremely challenging, but by leveraging our expertise, we were able to deliver a solution that not only met but exceeded expectations.”
This case highlights the power of strategic problem-solving and collaboration. AMT’s ability to step in, diagnose the issues, and implement efficient solutions underscores their leadership in automation engineering.
For companies facing similar end-of-line challenges, AMT has proven that expertise, innovation, and teamwork can turn a struggling project into a resounding success.